TSP Name: ENABLE GAS TRANSMISSION, LLC
TSP: 87-267-0161
Amend Rptg Desc: All Data
Svc Req K: 1012705
K Holder Name: GUNVOR USA LLC
K Holder: 049 86 6898
Affil Desc: NONE
Tracking No: 0052951
K Stat: N Post Date: 9/17/2025 Post Time: 1003089
K Qty-K: 10000 Contract Duration Contract Entitlement
IT Qty-K: 0 K Beg Date K End Date K Ent Beg Date K Ent Beg Time
K Roll: N 12/1/2025 2/28/2026 12/1/2025 0900000
Min Vol Qty - Non-Cap Rel: K Ent End Date K Ent End Time
Min Vol Pct - Non-Cap Rel: 0.00 3/1/2026 0859000
Cap Type Name: Primary Transaction Term Begin Date Transaction Term End Date:
12/1/2025 2/28/2026
Loc Purp
Loc Zn Loc Loc Name Desc
------- ------ ------------------------- -----------------------------------------------------------------
South 002008 GULF SOUTH @ BIST REC Receipt Location
South 801532 TGT PV CORE DEL Delivery Location
Loc K Max Press: Loc K Min Press:
K Qty - Loc: 10000 It Qty - Loc:
Rate Sch: FT
Seasnl St: 0/0/0
Seasnl End: 0/0/0
Rpt Lvl Desc: Point
Res Rate Basis Desc: Per Day
Rate Form/Type Desc: Blended Rate(combination of reservation and volumetric charges)
Rate
Rate Chgd Max Trf Max Trf Rate Ngtd Rate Mkt Based
Chgd Ref Rate Ref Desc Ind Desc Rate Ind Disc Beg Date Disc End Date
--------- --- ------- -------------- --------- --------- ------------- -------------
00.252800 Max 0.2528 Tariff No N
Loc/QTI Desc: Receipt point(s) to delivery point(s) quantity
Rate ID: 141
Surchg ID Desc: Compressor Usage Surcharge
Surchg Ind Desc:
Rate(s) stated do not include any applicable surcharges; surcharge detail and surcharge total provided
Tot Surchg: 0.00280
Terms/Notes:
If specific Pooling Area Pools are indicated as Receipt Locations,
the reference is to all generally available Pools and Additional
Individual Receipt Points in such Pooling Area.
Max Trf Rate and Rate Chgd expressed as blended rates
derived by adding the Commodity Charge and the unitized
Reservation Charge, calculated on an assumed 100% load factor
basis based on K Holder's K Qty-K, unless otherwise stated.
K Holder pays Reservation Charge regardless of quantities
transported.
Compressor Usage Surcharge (CUS), if applicable, is subject to change
semi-annually and/or subject to FERC approval.