TSP: 872670161
TSP Name: ENABLE GAS TRANSMISSION, LLC
Critical Notice Description: Not a critical notice
Notice Effective Date: 09/03/2025
Notice Effective Time: 14:40
Notice End Date: 09/08/2025
Notice End Time: 17:00
Notice Identifier: 6144
Notice Status Description: Initiate
Notice Type: TSP Capacity Offering
Posting Date/Time: 09/03/2025 14:29
Required Response Indicator Description: Respond by specified date and time
Response Date: 09/08/2025
Response Time: 17:00
Subject: PREARRANGED FIRM SERVICE
Notice Text:
Enable Gas Transmission, LLC ( EGT )
Notice of Prearranged Firm Service
Posting Number: 6144
September 3, 2025
Pursuant to Section 10.4 of the General Terms and Conditions ( GT&C ) of EGT s FERC Gas
Tariff, notice is hereby given of a Prearranged Service Agreement. The firm capacity that is
intended to be reserved is shown below:
8,000 Dth/d effective July 1, 2027 extending through June 30, 2032.
Capacity consists of 8,000 Dth/d from existing receipt points and pools in the South
Pooling Area and deliveries to the southern Arkansas area.
Prospective Shippers may submit a bid for such capacity, including specifying one or more
service commencement dates (with associated quantities). The Bidding Period for this capacity
will begin at 9:00 a.m. Central Clock Time, September 4, 2025 and will end at 5:00 p.m. Central
Clock Time, September 8, 2025. All bids must indicate the posting number, receipt point(s),
delivery point(s), rate, volume and term, and any other relevant terms and conditions.
Bids should be submitted by e-mail to: capacitybids@energytransfer.com
Bids may be withdrawn, revised and/or modified prior to the end of the Bidding Period, at which
time bids become binding and may not be withdrawn or modified. Bidders may not withdraw a
bid and resubmit a bid with a lesser value.
Consistent with Section 10.4 of the GT&C, EGT will evaluate the terms of the Pre-arranged
Service and all valid bids received during the Bidding Period to determine which offers the
highest total net present value ( NPV ) of incremental revenues to EGT. EGT will use the
following formula for this evaluation:
NPV = En [R * (1 / (1+i) * n)]
En = Summation of months 1 through n
n = term in months
R = Incremental monthly revenue
i = Monthly Discount Factor (current FERC quarterly rate) This rate can
be found at http://www.ferc.gov/legal/acct-matts/interest-rates.asp
These factors will be weighted equally. In the event of a tie, the following tie-breaker
methodology will be used:
1. Award to Pre-arranged Shipper, if involved in the tie.
2. Pro rata award to bidders involved in the tie.
EGT will consider revenues generated by reservation rates as well as potential value from
incremental charges for secondary or other commodity upcharges that may generate
revenue. For Shippers willing to pay a reservation rate or other form of guaranteed revenue
which exceeds the maximum Tariff rate for all or part of the term, the NPV calculated for the
Bid may not exceed an NPV that is calculated assuming that the maximum applicable recourse
rate shall be in effect for the full term proposed. Guaranteed throughput volume service will be
considered only if permissible under the Tariff and applicable regulations.
EGT may exclude from evaluation and deem ineligible bids for service:
(i) that detrimentally impact the operational integrity of EGT s system,
(ii) that do not satisfy all the terms of this posting,
(iii) that contain terms and conditions other than those set forth in the Tariff,
(iv) that are submitted by prospective Shippers which have not demonstrated
creditworthiness.
The Pre-arranged Shipper will have a one-time right to match any higher bid or combination of
bids in order to retain the capacity. EGT will notify the Pre-arranged Shipper by 12:00 p.m.
Central Clock Time on the Business Day following the end of the Bidding Period of any higher
bid or combination of bids. The Pre-arranged Shipper must respond to EGT by the close of the
next Business Day after receipt of notification. If the Pre-arranged Shipper elects not to match
the higher competing bid or bids, the capacity will be awarded to the highest eligible
bidder(s). Upon completion of the process, EGT will post on its Internet website an
announcement of the award of this capacity.
To confirm the receipt of bids by EGT, or for questions regarding this posting or the bid process,
please contact:
John Pawlik 713-989-7943 john.pawlik@energytransfer.com
For a more readable version of this document click Here