TSP: 872670161 TSP Name: ENABLE GAS TRANSMISSION, LLC Critical Notice Description: Not a critical notice Notice Effective Date: 11/15/2024 Notice Effective Time: 07:50 Notice End Date: 00/00/0000 Notice End Time: 00:00 Notice Identifier: 5843 Notice Status Description: Initiate Notice Type: Planned Service Outage Posting Date/Time: 11/15/2024 07:45 Required Response Indicator Description: No response required Response Date: Response Time: Subject: PLANNED SERVICE OUTAGES Notice Text: Revision Start Date End Date Prev Start DaPrev End Date Line / Facility Pooling Area Line Maintenance Potentia l Imp N 10/4/2023 TBD Line BT-1 / BT-1AN North Line BT-1 Isolation for line repairs 7 Y 10/15/2024 TBD 10/15/2024 11/11/2024 Line AD East / Ada Scraper Trap West Line AD Backpressure valve project 1 Y 11/4/2024 11/15/2024 11/4/2024 11/8/2024 Line J (Ark River to Rd Mt) North Line J ILI Project (Cleaning and MFL / EMAT runs 1 N 11/18/2024 11/22/2024 Waskom Plant South Line F-185 Plant Outage 8 N 11/18/2024 11/20/2024 Chandler Station West Line AD Unit 2 unavailable / inspection items 1 N 12/3/2024 12/6/2024 Amber Station West Line AD Unit 1 / Rod and Main Bearing Replacements 1 N 12/9/2024 12/13/2024 Malvern Station Nuetral Line AC Unit 4 / Water Pump Replacement 1 N 12/13/2024 12/16/2024 Custer Station West Line 2 Measurement / Facilities Upgrade 8 1. No capacity impact is expected at this time. 2. Coordinating with necessary loads. 3. Based on historical and current throughput, no capacity impact is expected. In the event nominations increase significantly, restrictions may become necessary. 4. Coordinating maintenance with interconnecting pipe to minimize customer impact. No capacity impact is expected at this time; however, if operating conditions change, affected parties will be notified. 5. Affected production notified of shut-in during work. 6. Customers may experience pressure fluctuations, but no capacity impact is anticipated. 7. Based upon customer nominations, restrictions may become necessary. 8. Based on all available information, capacity will be impacted. Capacity reductions will be done in accordance with the provisions of EGT's tariff regarding scheduling and interruption of services. O/A or News 5669/5670 N/A N/A 5785 N/A N/A N/A 5842 For a more readable version of this document click Here